We went back through yesterday and checked to make sure that everything we'd pointed out that needed to be repaired before the drywall goes up was taken care of... And, it all looks good... They've also put our insullation in now... The drywall's just sitting in sheets in several rooms of the house, waiting to be put up...so it shouldn't be too long now... Oh, and we were happily surprised to find out that a "little extra concrete" was poured in the back for our patio...so instead of the usual "3x3" slab we were supposed to get, we were blessed with an area that squares off with the house! So very nice!
The VA inspector was supposed to come check the insullation sometime yesterday afternoon... And, then, there was another person who was going to be overseeing the plywood installation that was also supposed to be stopping by... Hopefully, both guys made it over there and did "their thing"... If so, the drywall should be hung by the beginning/middle of next week, and then it takes 5 to 7 more days for all the taping and such... But, after all that...then, they'll start working on taking care of all the cosmetic stuff inside...and it should really start to look like a house... Yep, not too long now... We're really getting excited about being in our new home... Such an amazing blessing to have a home of our very own!
.jpg)
.jpg)
0 comments:
Post a Comment